At Trooli we believe in simplicity. We are building our own fibre optic networks. These networks are modern and fit for the digital age. We are so confident in our technology, we can be really clear with you about what speeds to expect when you buy our products.

As soon as we have cabled your street, you can order our service. We don’t wait until we have a minimum number of orders from your community. If you can order a service with us, the Trooli network is already a stone’s throw away from your premises. After you order one of our products, it takes up to 12 weeks to complete the fibre installation to your premises. You can choose a later installation if you want our service to start when your previous contract comes to an end – just let us know when you want to schedule your start date, and we’ll sort it out for you.

THE FOUR STAGES OF CONSTRUCTION

1. CONNECTION PLANNING
1. CONNECTION PLANNING
We design the fibre cable route that will bring your full fibre connection from the street to the external wall of your premises.
2. EXTERNAL INSTALL
2. EXTERNAL INSTALL
We build the fibre optic cable to your premises. We call this the ‘external demarcation point’, or ‘demarc’. We install a small box onto your external wall, and our fibre optic cable is connected into this box.
3. INTERNAL INSTALL
3. INTERNAL INSTALL
This extends the full fibre connection to your Trooli modem and Trooli router. A hole will be drilled through your external wall and our internal fibre optic cable connects up your Trooli equipment to the box outside.
4. COMMISSION & ACTIVATE
4. COMMISSION & ACTIVATE
A Trooli commissioning technician will visit your premises to connect your Trooli equipment up safely and activate your service.